Tips & Documents
Tips & Documents

Transportation/Unloading

Attention to Details

The products delivered should always be examined before unloading for possible damages that might have been caused during the transportation.In case that damages during transportation are noted they should be immediately reported to the company by fax along with a readable copy of the dispatch note.Photographs are necessary.The same procedure applies for possible defective products.Claims for replacement of damaged or defected products that will be made after the products receipt by the customer will not be accepted.

The palettes should be lifted and unloaded one by one at a time.The palettes up to 6 meters length should be unloaded by forklift or flexible lifting straps along with hollow sections.

dsc04167
container-loading
Straps every 2.5m max.

Straps every 2.5m max.

Unloading of >8.0m long panels

Unloading of >8.0m long panels

Protection of panels with textile cover

Protection of panels with textile cover

Always remember that

-The palettes longer than 6 meters should be unloaded by using metal frame in combination with hollow sections and lifting straps.It is not recommended to be unloaded by two fork forklift.Only the use of four fork forklifts is approved.

-Great attention should be given during tightening, transport and lift of the palettes.

Do not use metal strips, chains and wire ropes
Use special flexible straps along with trussing
Protect the edges using suitable hard plastic angles
Max allowed distance between fastening straps 2.50m
drawer-pulled-out
  • 13
  • 18
  • 14
  • 15
  • 16
  • 17
  • 19

Panels Installation

For the fastening on the purlings proper tools must be used supplied with automatic stop during the screwing to avoid any sagging to of the panel.In case of cutting the panel must be done also with the proper tools and with the protective film on.

Tips & Documents
crane
instru3
Adequate equipment for cutting panels

Adequate equipment for cutting panels

Important

For the cutting of the panel the proper tools must be used and with the protective film on.

 

The panels after they have been cut must be cleaned from  any scrap because the remaining of it  on the panel  will be stack and probably scratch and rust the panels.

Inappropriate tool for cutting

Inappropriate tool for cutting

Attention!

NEVER DRAG the panel from the palette.

The protective firm must be removed strictly RIGHT AFTER the installation.

Always use the appropriate equipment for the manipulation and installation if the panels,in order to avoid damage to the products.
First  lift  the  top  panel  sidewards  for  approx.  200mm

First lift the top panel sidewards for approx. 200mm

Distancers under the top panel help to avoid damage  the lower piece

Distancers under the top panel help to avoid damage the lower piece

Lift the top panel  on it’s  longer edge on the distancers

Lift the top panel on it’s longer edge on the distancers

The installation of all flashings must become also immediately with screws and not with rivet, so as the core of the panels to be covered. Otherwise any humidity or rain may destroy the panel.

Correct roof assembly sequence.

Correct roof assembly sequence.

The installation of all flashings must become also immediately with screws and not with rivet, so as the core of the panels to be covered. Otherwise any humidity or rain may destroy the panel.

The setting of the panels must become by specialized workers according to the specifications.
The panels must be installed in a maximum 3 months period after the production!.

Assembly of panels using  vacum lifter

Assembly of panels using vacum lifter